Ati2
Legend
Is that the end of the correct cable?the infrastructure works fine as it is brand new and has just been tested, I also tried it on a known working bit that had other stuff connected to it beforehand with the same result
Is that the end of the correct cable?the infrastructure works fine as it is brand new and has just been tested, I also tried it on a known working bit that had other stuff connected to it beforehand with the same result
the infrastructure is just a direct extension of cabling so should be the same as directly connectingIs it possible that a switch was not turn On, permitting it to integrate with the overall infrastructrure?
yesIs that the end of the correct cable?
But if you really wanna know go into PM with me.
Just by this sentence I know which side you’re on. No need for PMPlease note that Taiwan is still part of China. (Even tho I support them to leave China.)
So basically, your infrastrucrure is a like a power bar. If you plug your charger directly into a socket it'll charge your phone. If you plug it into the power bar, it should work too. Except you need to press the On switch on the power bar to let the electricity flow. Is that how your infrastructure should work?the infrastructure is just a direct extension of cabling so should be the same as directly connecting
yes
Go by your phoneI can't figure out what the time is. my kid has set every clock at home to a different time.
I'll say...you're on the West Coast![Whistling in the distance]
passive infrastructure is basically a load of cables connected together, think like an extension lead plugged into another extension lead, you still get power out the endSo basically, your infrastrucrure is a like a power bar. If you plug your charger directly into a socket it'll charge your phone. If you plug it into the power bar, it should work too. Except you need to press the On switch on the power bar to let the electricity flow. Is that how your infrastructure should work?
Some newer diamond farms get kicked out from guild due to inactivity
just sniped Bob for 250fp profit, his 2nd is wide open for anyone who has a few spare fp
(826fp for 950fp return)
I was watching it yesterday but the profit wasn't enough I think 250 is reasonable, I'm not too greedynot my guild in R. I hope.
It was ready since yesterday but what I really wanted was 3rd or 4th for 1 FP.
but I may miss that, so I just took 2nd.
oh well, maybe I could have waited for 3rd or 4th for 1 FP....
That may be the case, but if one wire is not properly connected with the duct tapeyou'll still won't have a full connection.passive infrastructure is basically a load of cables connected together, think like an extension lead plugged into another extension lead, you still get power out the end
What should I have for dinner?
I was watching it yesterday but the profit wasn't enough I think 250 is reasonable, I'm not too greedy
you put 25 too much on
Yes, and it’ll be a balmy day t’dayI'll say...you're on the West Coast!
1, 2, 3, 4, 5...I know.
it's not easy to avoid putting too much pressing the 10FP button more than 80 times, especially when there is a chance a few of us could be trying to get 2nd concurrently.
Have you run out of fingers?1, 2, 3, 4, 5...
I know.
it's not easy to avoid putting too much pressing the 10FP button more than 80 times, especially when there is a chance a few of us could be trying to get 2nd concurrently.
1, 2, 3, 4, 5...
Love to...but we're busy here
Yes...the other one is holding the phoneHave you run out of fingers?